Construction and site updates in May 2009
|
|
Larger Image (PDF)
NCCAR Aerial from East
Here is the full view of all the Phase 1A site from the east, including the building pads that are undergoing foundation cutting. The next photograph gives closer view of...
|
|
Larger Image (PDF)
The NCCAR site is now approaching a level of maturity as the ride and handling course is fully graded up to the large radius turn (denoted as “C1”) in the upper center of the photograph. Key...
|
|
Larger Image (PDF)
Viewed from the east, the NCCAR site is shown adjacent to the 1.4 million square feet Lowes Regional Distribution depot and Gaston in the background. Note the Phase 1A ride and handling course profile...
|
|
Larger Image (PDF)
Aerial View from above I95
Fine North Carolina weather allowed the December aerial photographs to be taken at the preferred 5,000 feet. This view shows very clearly how NCCAR will be accessed...
|
|
Larger Image (PDF)
Aerial View from above I95
November 6 was a challenging day for aerial photographs. The cloud base dictated that our pilot remain at 2,500 feet (rather than the preferred 5,000 feet). However, this...
|
|
Larger Image (PDF)
Aerial View from South
NCCAR site clearance has started on Phase 1A construction. This view from October 3, 2008 nicely shows the full extent of the NCCAR site. Phase 1A will encompass 155 acres,...
|