Construction Status Oct 2008 PDF Print E-mail

Larger Image (PDF)

Aerial View from South

NCCAR site clearance has started on Phase 1A construction. This view from October 3, 2008 nicely shows the full extent of the NCCAR site. Phase 1A will encompass 155 acres, extending up to the east / west track in the center of the photo. The eastern boundary follows the clearly visible tree line, whilst the western boundary runs through the woodlands roughly mid-way between the track and the clearance line (gas line). The power lines passing south west to north east across the lower area indicate where the NCCAR access road will enter the site near the water tower. For an idea of the scale – note the semi’s parked at the Lowes distribution center at the bottom of the photo. For more detailed and closer views see the other photos.




Larger Image (PDF)

Aerial View from South East

This view focuses on the clearance (the larger area south of the power lines) of the main drainage features required to manage water flows off the road surfaces and the erosion and sedimentation control measures to ensure that the NCCAR site operates in harmony with the local wetlands and environment. The smaller clearance to the west of the drainage control area is the location of the Operations and Engineering building. Note also the tiny ‘specs’ near the site entrance – these are the earth-moving trucks and excavators!




Larger Image (PDF)

Aerial View Showing Proximity to I95

This view is almost identical to the south east view, but includes a section of I95 in the top left corner. NCCAR will be accessible from exit 176 of I95 and is then only 1.5 miles from the junction.




Larger Image (PDF)

Aerial View from South West

This view shows the smoke from the fires resulting from the tree grubbing process and multiple semi’s at the Lowes distribution center.




Larger Image (PDF)

Aerial Close Up View of NCCAR Entrance

This is the entrance section of NCCAR. The Security Kiosk will be located centrally is the cleared area. The perimeter orange control fencing is clearly visible. This is used to ensure no damage to the natural areas beyond the construction zones and also for the agreed access paths beneath the Dominion power lines. Note the excavator digging out the entrance pond (which will feature a large decorative and functional fountain). The pond to the south is a temporary erosion control pond.

 

CarTech Newsletter

newsletterAlso, don't forget to sign up for the next edition of our newsletter “CarTech”. Just follow the link below and sign up to receive the latest issue (and future issues).

 

Find Out More

 

Construction Status

constatNCCAR features construction phases in an easy to navigate gallery.  Here you will see aerial photos as well as site and building images from various phases.

 

Find Out More